ABOUT THE PROJECT
The Frederick Douglass Memorial Bridge Project calls for replacing the 68-year-old bridge and reconstruction of the Suitland Parkway/I-295 interchange. The bridge has been classified functionally obsolete and needs to be replaced due to its condition, age and functional limitations. This project will increase pedestrian and vehicular safety, improve multimodal transportation options, increase community accessibility and support economic development on both sides of the Anacostia River.
This project is one in a series of transportation, environmental, economic, community, and recreation projects developed by the larger Anacostia Waterfront Initiative (AWI) Program. From the Tidal Basin to the city’s northeast border with Maryland, the 30-year, $10 billion AWI Program is transforming the shores of the Anacostia River into a world-class waterfront and enriching nearby communities. For more information about AWI, visit the website: anacostiawaterfront.org.
Project Start: Summer 2017 | Project Completion: End of 2021
DBE Contracting Opportunities Open House
Thursday, February 22, 2018, 10am-12pm
Matthews Memorial Baptist Church
2616 Martin Luther King Jr Ave, SE
Construction Trades Job Fair
Tuesday, February 27, 2018, 5pm-8pm
Matthews Memorial Baptist Church
2616 Martin Luther King Jr Ave, SE
![](https://static.wixstatic.com/media/e5ddb7_1b48711254f343c38fb071e3069d6f9e~mv2.png/v1/crop/x_168,y_15,w_1002,h_748/fill/w_861,h_643,al_c,q_90,usm_0.66_1.00_0.01,enc_avif,quality_auto/e5ddb7_1b48711254f343c38fb071e3069d6f9e~mv2.png)
KEY PROJECT ELEMENTS
-
Building a new six-lane Frederick Douglass Memorial Bridge
-
Creating a new traffic oval west of the river that connects South Capitol Street, Potomac Avenue and Q Street SW
-
Creating a new at-grade traffic oval east of the river that connects South Capitol Street, Suitland Parkway and Howard Road SE
-
Reconstructing the Suitland Parkway/Interstate 295 interchange
-
Increasing bicycle and pedestrian facilities
-
Improving drainage and storm water management throughout the corridor
![](https://static.wixstatic.com/media/e5ddb7_d3a8c57db90b43d8827e825e32a5ea29~mv2_d_3358_1940_s_2.png/v1/fill/w_855,h_494,al_c,q_90,usm_0.66_1.00_0.01,enc_avif,quality_auto/e5ddb7_d3a8c57db90b43d8827e825e32a5ea29~mv2_d_3358_1940_s_2.png)
PROJECT GALLERY
![](https://static.wixstatic.com/media/e5ddb7_2d6a7c2b8e40431ca6b2408a772c3495~mv2_d_3389_1939_s_2.png/v1/fill/w_884,h_506,al_c,q_90,usm_0.66_1.00_0.01,enc_avif,quality_auto/e5ddb7_2d6a7c2b8e40431ca6b2408a772c3495~mv2_d_3389_1939_s_2.png)